- Tack fasten the Flexfoil to
the purlins.
- Ensure that enough material
is draped between the purlins to allow the Flexfoil
to sag approximately 3/4", thereby creating
an airspace between the roof decking and the material
- After the first 4ft of Flexfoil
is fastened, attach the roof sheeting over that area.
- Ensure that all of the adjoining
seams are taped using Flexfoil reflective tape.
- Repeat the above steps for
the next section of the roof.
- Ensure that the ridge vent
is left exposed (if applicable).
- The ventilation design should
not be tampered with when installing any insulation.
|