 |
| STEP 1: Measure the area to determine
the square footage of FLEXFOIL SOLUTIONS VAPOUR BARRIER
required. |
| STEP 2: Check the area you are installing
and make any needed repairs before installing FLEXFOIL
SOLUTIONS VAPOUR BARRIER. |
| STEP 3: Roll out FLEXFOIL SOLUTIONS
VAPOUR BARRIER over concrete floor with aluminum side
facing up. |
| STEP 4: Ensure that a 3/4” air
space is maintained between the product and the outer
surface in order to optimize system R-Values. |