| STEP 1: Measure the area to determine
the square footage of FLEXFOIL SOLUTIONS VAPOUR BARRIER
required. |
| STEP 2: Install FLEXFOIL SOLUTIONS
VAPOUR BARRIER on the warm side of the insulated frame
wall. |
| STEP 3: Fasten the FLEXFOIL SOLUTIONS
VAPOUR BARRIER between the studs, stapling every 3"
- 4". The foil side should face the interior of the
room. |
| STEP 4: Fasten the drywall or paneling
directly onto the studs. Ensure that a 3/4” air
space is maintained between the product and the outer
surface in order to optimize system R-Values. |